4.3 Checkpoint: Prototype Demo & Validation Summary
The Integration Checkpoint connects the Skill Track and the Venture Track. You show what you learned in Module 4 with evidence, not opinion.
Checkpoint assignment
- Prototype demo plus customer validation summary
- Present prototype and testing results
- Document iteration decisions
Evidence portfolio requirements
Add each of these to your evidence portfolio before moving on:
- Solution Concept Portfolio (5–10 Ideas)
- MVP Definition Document
- Low-Fidelity Prototype (Photos/Screenshots/Description)
- Prototype Testing Feedback (3–5 Customers)
- Solution Selection Rationale
- Iteration Summary
Get feedback before you submit
Paste your draft into the Module 4 AI advisor for coaching on your thinking before you turn it in. The advisor gives feedback; the work and the decisions stay yours.
How this checkpoint is assessed
Your instructor chooses one of three paths, so every student can succeed whether or not their venture moves forward:
- Option A (default): 40% Skill Track, 40% Venture Track, 20% Integration
- Option B: 100% Skill Track, for students whose ventures don't progress
- Option C: 100% Venture Track, for experienced students
Looking ahead
Module 5 builds directly on this evidence, so keep your portfolio up to date.